Eighteen bridges throughout the 10 Freeway corridor are being replaced, widened or improved, the transportation authority reported.įor information about the project, call 877-55-SBCTA or send an email to To sign up for text messages about freeway lane closures, text 10expresslanes to 88. East of Haven Avenue, two express lanes will be constructed.īecause adding lanes is actually widening the freeway, it requires expanding the bridges. The HOV lane will still be available to drivers, but will increase from two-plus to three-plus. For example, west of Haven Avenue, a single new lane will be built and combined with the existing high-occupancy vehicle, or HOV, lane to provide two express lanes in each direction. In addition, lanes to assist drivers getting on and off the freeway (auxiliary lanes) will be constructed in selected locations. The project includes two tolled express lanes in each direction. The transportation authority’s project will widen the 10 Freeway between the Los Angeles/San Bernardino County line and the 15 Freeway, a distance of about 10 miles.
0 Comments
Leave a Reply. |